WORK PACKAGES AND PRODUCED DOCUMENTS:
THEMATIC WP1: IMPROVING THE GOVERNANCE
The WP will deliver a policies assessment in the fields of historic built areas (HBA) management. The assessment will evaluate and synthetize existing governance and policies in the Central Europe countries ( D.T1.1.1 for single countries assessment and D.T1.1.2 for synthesis at CE level) to deliver a reference document (strategy for the sustainable management of HBA) for the successive project activities (D.T1.3.1). Locally the strategy has been transpose into local bilingual guidelines (D.T1.3.2) in order to give local administrations a reference document for the implementation of a sustainable management of HBA. Within the WP we have developed a Best Practice transfer tool (D.T1.2.3) as a support instrument for HBA evaluation and strategy definition. The tool is available for consultation on BhENEFIT website, here a manual for users:
Deliverables:
- D.T1.1.1 - Detailed Assessment of HBA governance system at national level
- D.T1.1.2 - Assessment of HUA governance at CE level
- D.T1.1.3 - Minutes of meetings
- D.T1.2.1 - Best practice inventory
- D.T1.2.2 - Transfer visits and reports : Slovakia, Austria, Italy
- D.T1.2.3 - Best practice transfer tool
- D.T1.3.1 - Shared strategy for an integrated governance system of HBA within CE region
- D.T1.3.2 - Guidelines for the implementation of the strategy at CE level
THEMATIC WP2: DEPLOYMENT OF INSTRUMENT & TOOLS
This WP is focused on maintenance effects on HBA and is structured on 3 consequential activities, each related to outputs, these are: identification of the main components for the sustainable technical management of an HBA, which is the best scale to approach them, and possible positive/negative interactions between them; monitoring process of what is going on inside an Historic Built Area (all the components usually managed by different offices have been collected and studied) & planning of interventions starting from monitoring data. All these activities are going to be tested through Pilot actions based on GIS (tested in Mantova and Poprad) and BIM (tested in Bad Radkersburg and Karlovac) technolgies.
Deliverables:
- D.T2.1.1 - Handbook of main components of HBA sustainable performance
- D.T2.1.2 - Specifications of the defined components at local level (pilot areas)
- D.T2.1.3 - minutes of meetings
- D.T2.2.1 - State of the art and monitoring system requirements for risk management, resuse, energy and performances
- D.T2.2.2 - Methodologic model for an integrated monitoring system
- D.T2.2.3 - Report on bilingual guidelines for the local development of a monitoring plan for an HBA in every PA
- D.T2.2.4 - Deployment of a Web-GIS platform for the integrated monitoring of changes and modifications in a HBA
- D.T2.2.5 - Local training activities for PA technicians and stakeholders related to the use of the web-GIS tool --> on-going
- D.T2.2.6 - web-gis platform manual
- D.T2.3.1 Monitoring plan for HBA in Mantova
- D.T2.3.2 -Implementation of the web-gis platform in Mantova --> on-going
- D.T2.3.3 - report on investments for pilot action in Mantova
- D.T2.3.4 - Monitoring plan for HBA in Poprad
THEMATIC WP3: INCREASING AWARENESS & CAPACITY BUILDING
The sustainable management of HBA requires the cooperation between various subjects. Different from a common targeted dissemination activity, this WP aims to raise awareness in many typologies of subjects, both private and public, about their possible roles inside a more sustainable approach to HBA management and risk prevention.